Skip to main content
dleerdefi
GitHub 创作者资料

dleerdefi

按仓库查看 1 个 GitHub 仓库中的 14 个已收集 skills。

已收集 skills
14
仓库
1
更新
2026年10月18日
仓库分布

Skills 分布在哪些仓库

按已收集 skill 数展示主要仓库,并显示它们在该创作者目录中的占比和职业覆盖。

仓库浏览

仓库与代表性 skills

sheet-splitter
未分类

Split a bound drawing set PDF into individual sheet PDFs. Extracts sheet numbers from title blocks via vision, renames files, and records where the cover sheet's drawing index disagrees with the set, logging the ones that need an RFI for rfi-drafter.…

2026年10月18日
pe-review
未分类

Checks construction drawings and specs for what's missing, cross-trade coordination conflicts and scope gaps, with PE judgment. Use for 'what's missing', 'check coordination', 'scope gap', or researching an RFI before answering it. Not for drafting RFIs…

2026年10月16日
schedule-extractor
未分类

Extract tabular schedule data from construction drawings — door, window, finish, fixture, panel schedules — and output to Excel. Triggers: 'door schedule', 'extract schedule', 'schedule to Excel', 'panel schedule'.

2026年10月16日
bid-evaluator
未分类

Evaluate tabulated subcontractor bids against specs and drawings — scope gap analysis, exclusion risk scoring, award recommendation. Triggers: 'evaluate bids', 'bid evaluation', 'lowest responsible bidder'.

2026年10月16日
construction-guide
未分类

Operating guide for construction project documents — load before reading drawings, specs, schedules, RFIs, submittals or bids. Data-access rules (never read PDFs directly; rasterize first), AgentCM graph-guided vision, drawing and cross-reference conventions,…

2026年10月16日
spec-splitter
未分类

Split a bound project manual PDF into individual spec section PDFs and extract searchable text. Triggers: 'split specs', 'break up the project manual', 'separate spec sections', 'extract spec text'. Prerequisite for /submittal-log-generator.

2026年10月16日
submittal-review
未分类

Expert PE review of a submittal (shop drawings, product data, samples, equipment brochures) against specs, drawings, code questions and trade coordination. Produces findings with both sources, trade routing and a completeness gate. Triggers: 'review…

2026年10月16日
tag-audit-and-takeoff
未分类

Count-based quantity takeoff and tag completeness auditing for construction drawings. Vision + OCR reconciliation, sheet markup, Excel QTO output. Triggers: 'tag audit', 'quantity takeoff', 'QTO', 'count fixtures'.

2026年10月16日
已展示 8 / 14 个已收集 Skill。
已展示 1 / 1 个仓库
已展示全部仓库