scope-check

Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'

소스 정보

저장소
Donchitos/Claude-Code-Game-Studios
최근 소스 활동
2026년 10월 8일 06:52
감지된 SKILL.md 언어
영어
스타
26,158
포크
3,702

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
scope-check
description
Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'
argument-hint
[feature-name or sprint-N]
user-invocable
true
allowed-tools
Read, Glob, Grep, Bash(git log *)
model
haiku
# Scope Check This skill is read-only — it reports findings but writes no files. Compares original planned scope against current state to detect, quantify, and triage scope creep. **Argument:** `$ARGUMENTS` — the whole string: a feature name (it may be several words), sprint number, or milestone name. --- ## Phase 1: Find the Original Plan Locate the baseline scope document for the given argument: - **Feature name** → read `design/gdd/[feature].md` or matching file in `design/` - **Sprint number** (e.g., `sprint-3`) → read `production/sprints/sprint-003.md` (the name `/sprint-plan` writes) or similar - **Milestone** → read `production/milestones/[name].md` If the document is not found, report the missing file and stop. Do not proceed without a baseline to compare against. --- ## Phase 2: Read the Current State Check what has actually been implemented or is in progress: - Scan the codebase for files related to the feature/sprint - Read git log for commits related to this work (`git log --oneline --since=[start-date]`) - Check for TODO/FIXME comments that indicate unfinished scope additions - Check active sprint plan if the feature is mid-sprint --- ## Phase 3: Compare Original vs Current Scope Produce the comparison report: ```markdown ## Scope Check: [Feature/Sprint Name] Generated: [Date] ### Original Scope [List of items from the original plan] ### Current Scope [List of items currently implemented or in progress] > **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.** > Replace the counts and the Bloat Score with > `[Baseline | Current state] unusable — see verdict` (whichever side could not > be read) and give the reason. A rendered > `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED > verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to > kill, one phase earlier — and readers trust a number over a caveat. ### Scope Additions (not in original plan) | Addition | Source | When | Justified? | Effort | |----------|--------|------|------------|--------| | [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] | ### Scope Removals (in original but dropped) | Removed Item | Reason | Impact | |-------------|--------|--------| | [item] | [why removed] | [what's affected] | ### Bloat Score - Original items: [N] - Current items: [N] - Items added: [N] (+[X]%) - Items removed: [N] - Net scope change: [+/-N] ([X]%) ### Risk Assessment - **Schedule Risk**: [Low/Medium/High] — [explanation] - **Quality Risk**: [Low/Medium/High] — [explanation] - **Integration Risk**: [Low/Medium/High] — [explanation] ### Recommendations 1. **Cut**: [Items that should be removed to stay on schedule] 2. **Defer**: [Items that can move to a future sprint/version] 3. **Keep**: [Additions that are genuinely necessary] 4. **Flag**: [Items that need a decision from producer/creative-director] ``` --- ## Phase 4: Verdict Assign a canonical verdict based on net scope change: | Net Change | Verdict | Meaning | |-----------|---------|---------| | ≤10% | **PASS** | On Track — within acceptable variance | | >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts | | >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline | | >50% | **FAIL** | Out of Control — stop, re-plan, escalate to producer | **Before applying that table, check that the percentage means something.** Emit **NOT ASSESSED** instead — never a computed percentage — when any of: - The **baseline document exists but enumerates no scope items** (all headings, placeholders, or `[TO BE CONFIGURED]`). Phase 1 stops when the file is *absent*; this is the case where it is present and empty, and it is the more dangerous one, because zero items yields a 0% net change that renders as **PASS — On Track**. Nothing was compared. Nothing was on track. - The **current state cannot be determined** — no related source files, no commits in the window, nothing in progress to read. Comparing a real baseline against an unreadable present is not a 0% change, and not the −100% that zero current items computes — the table reads both as PASS. - The denominator would be zero for any other reason. A percentage computed from no baseline items is not a small number; it is not a number. `NOT ASSESSED` **outranks PASS** (a comparison that never happened has not shown scope is on track) and **ranks below CONCERNS and FAIL** (measured creep is more actionable than an unmeasurable baseline). Output the verdict prominently: ``` **Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]** Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control] [or: NOT ASSESSED — [which side could not be read, and why]] ``` --- ## Phase 5: Next Steps After presenting the report, offer concrete follow-up: - **PASS** → no action required. Suggest re-running before next milestone. - **NOT ASSESSED** → say which side was unreadable and what would fix it (populate the baseline document, or point the skill at where the work actually lives). Do not offer a re-run against the same inputs — it will produce the same non-answer. - **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order). - **FAIL** → recommend escalating to producer. Reference `/sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/estimate` to re-baseline timeline. End every verdict except NOT ASSESSED with: > "Run `/scope-check [name]` again after cuts are made to verify the verdict improves." (NOT ASSESSED ends with what would make it assessable, above — a re-run against the same inputs would repeat the non-answer.) --- ### Rules - Scope creep is additions without corresponding cuts or timeline extensions - Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for - When recommending cuts, prioritize preserving the core player experience over nice-to-haves - Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is