Skip to main content

upgrading-emdash

Upgrade an existing EmDash project with upgrade-emdash, interpret .emdash/UPGRADE.md, apply required project changes, and verify the package, skill, and migration result. Use when asked to update or upgrade EmDash dependencies. Do not use for an unrelated schema change or a known database migration without a package upgrade.

소스 정보

저장소
emdash-cms/emdash
최근 소스 활동
2026년 10월 6일 20:37
감지된 SKILL.md 언어
영어
스타
13,662
포크
1,300

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
upgrading-emdash
description
Upgrade an existing EmDash project with upgrade-emdash, interpret .emdash/UPGRADE.md, apply required project changes, and verify the package, skill, and migration result. Use when asked to update or upgrade EmDash dependencies. Do not use for an unrelated schema change or a known database migration without a package upgrade.
# Upgrading EmDash Use `upgrade-emdash` to resolve the selected npm release tag, update every direct EmDash package, refresh the EmDash skills, and create the project-specific work order. The updater does not edit application code, apply database migrations, or deploy. ## Prepare the work order Run from the project root: ```sh npx upgrade-emdash@latest --dry-run npx upgrade-emdash@latest ``` Use `--to <tag>` for another npm dist-tag such as `next` or `beta`. `--to` does not accept a version. Use `--yes` to accept the updater prompt in a non-interactive environment, `--json` for a machine-readable dry-run, and `--cwd <path>` when the project root is elsewhere. The updater writes `.emdash/UPGRADE.md`. Read that file after the command finishes. It contains the complete authored changelog entries crossed by the direct packages in this project, with generated dependency-bump entries removed, plus the exact core migration delta found after installation. ## Complete the upgrade 1. Inspect the existing project and its uncommitted changes. Preserve unrelated work. 2. Assess every release entry in `.emdash/UPGRADE.md` against the project. Apply required source and configuration changes. Do not adopt a new feature when the project does not use the affected surface. 3. Run the repository's relevant format, tests, typecheck, and build commands. 4. Run the migration status command from the work order and report the target database and pending migrations. 5. When the work order lists added core migrations, the status command reports an earlier pending migration, or a release entry requires a data-changing project action, follow the work order's backup procedure before starting or deploying the upgraded application. 6. Ask before applying a migration to a database, deploying, or making any other remote change unless the user explicitly included that action in the request. 7. After authorized migration and deployment work, run the migration check and verify the affected site paths. Treat core migrations as forward-only. A package update with no added or pending migrations does not require an upgrade-specific recovery point. Before an authorized database-changing step, require a restorable database backup created with [Backups and recovery](https://docs.emdashcms.com/guides/backups/), a separate media backup, the relevant encryption keys, and the same build artifact for migration and deployment. A JSON backup is not a recovery point. Roll back by restoring the matching database and application artifact together, not by running migration `down()` functions or deleting migration records.
GitHub에서 보기