Skip to main content

upgrading-emdash

Upgrade an existing EmDash project with upgrade-emdash, interpret .emdash/UPGRADE.md, apply required project changes, and verify the package, skill, and migration result. Use when asked to update or upgrade EmDash dependencies. Do not use for an unrelated schema change or a known database migration without a package upgrade.

来源信息

仓库
emdash-cms/emdash
最近来源活动
2026年10月6日 20:37
检测到的 SKILL.md 语言
英语
星标
13,662
分支
1,300

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。

正在显示 SKILL.md

SKILL.md
来源说明 · 只读预览
name
upgrading-emdash
description
Upgrade an existing EmDash project with upgrade-emdash, interpret .emdash/UPGRADE.md, apply required project changes, and verify the package, skill, and migration result. Use when asked to update or upgrade EmDash dependencies. Do not use for an unrelated schema change or a known database migration without a package upgrade.
# Upgrading EmDash Use `upgrade-emdash` to resolve the selected npm release tag, update every direct EmDash package, refresh the EmDash skills, and create the project-specific work order. The updater does not edit application code, apply database migrations, or deploy. ## Prepare the work order Run from the project root: ```sh npx upgrade-emdash@latest --dry-run npx upgrade-emdash@latest ``` Use `--to <tag>` for another npm dist-tag such as `next` or `beta`. `--to` does not accept a version. Use `--yes` to accept the updater prompt in a non-interactive environment, `--json` for a machine-readable dry-run, and `--cwd <path>` when the project root is elsewhere. The updater writes `.emdash/UPGRADE.md`. Read that file after the command finishes. It contains the complete authored changelog entries crossed by the direct packages in this project, with generated dependency-bump entries removed, plus the exact core migration delta found after installation. ## Complete the upgrade 1. Inspect the existing project and its uncommitted changes. Preserve unrelated work. 2. Assess every release entry in `.emdash/UPGRADE.md` against the project. Apply required source and configuration changes. Do not adopt a new feature when the project does not use the affected surface. 3. Run the repository's relevant format, tests, typecheck, and build commands. 4. Run the migration status command from the work order and report the target database and pending migrations. 5. When the work order lists added core migrations, the status command reports an earlier pending migration, or a release entry requires a data-changing project action, follow the work order's backup procedure before starting or deploying the upgraded application. 6. Ask before applying a migration to a database, deploying, or making any other remote change unless the user explicitly included that action in the request. 7. After authorized migration and deployment work, run the migration check and verify the affected site paths. Treat core migrations as forward-only. A package update with no added or pending migrations does not require an upgrade-specific recovery point. Before an authorized database-changing step, require a restorable database backup created with [Backups and recovery](https://docs.emdashcms.com/guides/backups/), a separate media backup, the relevant encryption keys, and the same build artifact for migration and deployment. A JSON backup is not a recovery point. Roll back by restoring the matching database and application artifact together, not by running migration `down()` functions or deleting migration records.
在 GitHub 查看