Guides construction PMs through building commissioning, TAB, punch lists, O&M documentation, warranties, and project closeout.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Guides construction PMs through building commissioning, TAB, punch lists, O&M documentation, warranties, and project closeout.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Building envelope systems including curtain wall, roofing, waterproofing, cladding, and the four control layers for construction managers.
Guides PMs on contemporaneous recordkeeping, delay notices, and documentation practices that support potential construction claims.
Contract administration guidance for construction PMs—notice requirements, change orders, T&M documentation, claims, liens, and subcontract management.
Guidance for construction PMs on correctional facilities, jails, and detention centers including security systems, codes, and specialized building requirements.
Construction management for museums, cultural centers, galleries, archives, and institutional facilities requiring specialized environmental control and collection protection.
Data center construction guidance for mission-critical facilities including power, cooling, redundancy, and commissioning.
| name | commissioning-closeout |
| description | Guides construction PMs through building commissioning, TAB, punch lists, O&M documentation, warranties, and project closeout. |
This skill serves as the capstone for construction project management, integrating all trades and coordination skills to deliver a fully commissioned, documented, and turned-over project. Use this skill to navigate the systematic process of verifying building systems, completing punch lists, compiling closeout documentation, and transitioning the project to the owner.
| Phase | Key Activities | PM Responsibilities |
|---|---|---|
| Pre-Design | OPR development, CxA selection | Support owner, review scope |
| Design | BOD review, Cx specs | Review specifications |
| Construction | Pre-functional, FPT, issues | Coordinate, schedule, track |
| Acceptance | Seasonal testing, final report | Verify completion, acceptance |
| Post-Occupancy | Warranty support, 11-month walk | Callback coordination |
| System Category | Key Systems | Reference Skill |
|---|---|---|
| HVAC | Heating, cooling, ventilation, exhaust | [mechanical-plumbing-systems] |
| Electrical | Power distribution, emergency, lighting | [electrical-systems] |
| Plumbing | Domestic water, sanitary, specialty | [mechanical-plumbing-systems] |
| Fire Protection | Sprinkler, fire alarm, smoke control | [fire-protection-systems] |
| Building Envelope | Air barrier, waterproofing, thermal | [building-envelope-exterior] |
| Low-Voltage | BAS, security, AV, nurse call | [low-voltage-technology] |
| Vertical Transport | Elevators, escalators | [elevators-vertical-transportation] |
| Specialty | Kitchen, lab, medical equipment | [equipment-division-11] |
| Sustainable | Solar PV, EV, BESS, geothermal | [sustainable-systems] |
| Milestone | Criteria | Key Deliverables |
|---|---|---|
| Pre-Substantial | Systems operational, Cx near complete | Pre-punch complete |
| Substantial Completion | Occupiable, life safety complete | Certificate of SC, TCO/CO |
| Punch List Complete | All items resolved | Sign-off documentation |
| Final Completion | All work/docs complete | Final CO, final payment |
| Warranty End | 11-month walk complete | Warranty closeout |
| Measurement | Tolerance | Notes |
|---|---|---|
| Supply/Return Air | ±10% of design | Per terminal/zone |
| Outside Air | 0 to +10% of design | Never less than design |
| Exhaust Air | 0 to +10% of design | Never less than design |
| Hydronic Flow | ±10% of design | Per terminal |
| System Total | ±5% of design | Overall system |
| Document | Responsibility | Timing |
|---|---|---|
| O&M Manuals | Contractor/Subs | Before SC |
| As-Built Drawings | Contractor/Subs | Before FC |
| Warranties | Contractor/Subs | At SC |
| Training Records | Contractor | Before occupancy |
| Commissioning Report | CxA | Before FC |
| TAB Report | TAB Contractor | Before Cx FPT |
| Final Lien Waivers | All parties | At final payment |
| Skill | Integration Points |
|---|---|
| [procore-project-management] | Punch lists, documentation, submittals, issue tracking |
| [quality-control-closeout] | QC framework, completion procedures |
| [vdc-bim-coordination] | As-built models, COBie, BIM integration |
| [schedule-management-cpm] | Closeout schedule, milestones, critical path |
| [contract-administration] | Substantial/final completion, retainage, payments |
| [subcontractor-management] | Sub closeout, lien waivers, warranty coordination |
| [owner-stakeholder-communication] | Turnover, training coordination, owner relations |
| [claims-delay-documentation] | Closeout claims, delay documentation |
| Skill | Integration Points |
|---|---|
| [mechanical-plumbing-systems] | HVAC commissioning, TAB, plumbing systems |
| [electrical-systems] | Electrical commissioning, emergency power, lighting |
| [fire-protection-systems] | Fire alarm, sprinkler, smoke control, integration |
| [low-voltage-technology] | BAS, security, AV, nurse call commissioning |
| [elevators-vertical-transportation] | Elevator testing, inspection, certification |
| [equipment-division-11] | Kitchen, lab, medical equipment commissioning |
| [sustainable-systems] | Solar, EV, BESS, geothermal commissioning |
| [structural-trades] | Special inspections closeout |
| [building-envelope-exterior] | Envelope commissioning, air/water testing |
| [interior-finishes-trades] | Finishes punch, protection |
| [doors-frames-hardware] | Hardware adjustment, keying schedules |
| [specialties-division-10] | Specialties verification |
| [furnishings-division-12] | Furniture installation, FF&E punch |
| [site-improvements-division-32] | Site punch, landscaping warranty |
| [early-phase-enabling-trades] | Utility closeout, site stabilization |
| [construction-safety-management] | Safety during commissioning activities |