Guides PMs through preconstruction activities including bid leveling, value engineering, GMP development, and buyout procedures.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Guides PMs through preconstruction activities including bid leveling, value engineering, GMP development, and buyout procedures.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Building envelope systems including curtain wall, roofing, waterproofing, cladding, and the four control layers for construction managers.
Guides PMs on contemporaneous recordkeeping, delay notices, and documentation practices that support potential construction claims.
Guides construction PMs through building commissioning, TAB, punch lists, O&M documentation, warranties, and project closeout.
Contract administration guidance for construction PMs—notice requirements, change orders, T&M documentation, claims, liens, and subcontract management.
Guidance for construction PMs on correctional facilities, jails, and detention centers including security systems, codes, and specialized building requirements.
Construction management for museums, cultural centers, galleries, archives, and institutional facilities requiring specialized environmental control and collection protection.
| name | preconstruction-estimating |
| description | Guides PMs through preconstruction activities including bid leveling, value engineering, GMP development, and buyout procedures. |
This skill helps Project Managers participate effectively in preconstruction activities—understanding processes, asking the right questions, and setting projects up for construction success.
Note: Detailed estimating is performed by professional estimators. The PM's role is review, coordination, and ensuring constructability and completeness—not quantity takeoff or pricing.
| Phase | PM Role | Key Deliverables |
|---|---|---|
| Bidding | Review bid packages, attend scope reviews | Leveled bid analysis, scope gap identification |
| Value Engineering | Facilitate VE sessions, coordinate owner decisions | VE log, cost-benefit analyses |
| Constructability | Lead constructability reviews, document issues | Constructability report, RFIs to design team |
| Prequalification | Review subcontractor qualifications | Prequalification matrix, recommendations |
| GMP Development | Coordinate estimate completion, review assumptions | GMP proposal, allowance schedule |
| Risk Planning | Facilitate risk workshops, develop mitigation | Risk register, contingency allocation |
| Buyout | Execute subcontracts, track savings | Buyout log, commitment schedule |
Design Development ──────────────────────────────────────────────────────►
│
├── Constructability Reviews (ongoing throughout design)
│
├── Subcontractor Prequalification
│ │
│ ▼
├── Bid Phase
│ │
│ ├── Issue Bid Packages
│ ├── Pre-Bid Meetings
│ ├── Receive Bids
│ └── Bid Leveling & Interviews
│ │
│ ▼
├── Value Engineering
│ │
│ └── VE Sessions → Owner Decisions
│ │
│ ▼
├── GMP Development
│ │
│ ├── Estimate Compilation
│ ├── Allowance Identification
│ ├── Contingency Development
│ └── GMP Proposal
│ │
│ ▼
└── Buyout Phase
│
├── Scope Review with Subs
├── Contract Negotiations
└── Commitment Execution
| Metric | Target | Red Flag |
|---|---|---|
| Bid coverage | 3+ bids per trade | <2 bids on major trades |
| VE acceptance rate | 40-60% | <20% indicates poor idea quality |
| Buyout variance | Within ±3% of estimate | >5% loss indicates scope gaps |
| Prequalification rate | 100% of major subs | Unqualified subs on critical trades |
| Risk register items | All major risks identified | Unmitigated high-impact risks |
Detailed procedures and templates are available in the following reference files:
| Reference | Content |
|---|---|
| Bid Leveling & Scope Alignment | Leveling spreadsheets, scope matrices, clarification questions, interview techniques |
| Value Engineering | VE process, idea development, cost-benefit analysis, VE logs, owner presentations |
| Constructability Review | Review process, system checklists, documentation, design-phase input |
| Subcontractor Prequalification | Questionnaires, financial review, safety evaluation, reference checks |
| GMP Development | GMP process, allowances, contingencies, conversion procedures |
| Risk Register Development | Risk identification, quantification, allocation, mitigation strategies |
| Estimate Review Procedures | Quantity verification, pricing validation, documentation standards |
| Buyout Procedures | Buyout tracking, savings/loss analysis, scope transfer, commitment management |
| Issue | Warning Signs | PM Action |
|---|---|---|
| Incomplete scope coverage | Missing bid items, vague allowances | Review scope matrix with estimator |
| Bid spreading | Wide price variance (>20%) | Verify scope alignment, conduct interviews |
| Unrealistic schedule | No permit timeline, compressed phases | Push back with historical data |
| Insufficient contingency | <3% on design-build, <5% on incomplete docs | Escalate risk concerns |
| Unqualified subcontractors | Failed prequalification criteria | Recommend requalification or rejection |
| Unaddressed constructability | Design conflicts, access issues | Document and RFI before GMP |
| Related Skill | Handoff Point |
|---|---|
| Procore Project Management | Bidding module setup, project creation |
| Subcontractor Management | Post-award subcontractor coordination |
| Contract Administration | Change orders, payment applications |
| Schedule Management | Baseline schedule development |
| VDC/BIM Coordination | Model-based quantity validation |