ncr-punch-writer
未分类

Write a construction NCR, punch item, or defect notice with clause or drawing reference, evidence required, disposition, and close-out status. Use when the user says NCR, non-conformance, punchlist, snag, defect, defective work, or close-out item.

2026年9月30日
tender-compare-matrix
未分类

Build a construction tender or quote comparison matrix covering price, exclusions, programme, insurances, bonds, and qualifications without picking a winner. Use when the user says tender compare, bid tab, quote matrix, compare subcontractors, compare…

2026年9月30日
variation-eot-draft
未分类

Draft a construction variation or extension of time notice with fact, entitlement pathway, time, and money kept in separate lanes. Use when the user says variation, VO, variation order, EOT, delay notice, extra work, direction to change, latent condition, or…

2026年9月30日
daily-site-diary
未分类

Build a construction daily site diary or daily report from notes, voice dump, photos, or labour-plant lists. Use when the user says diary, daily report, site report, labour and plant, weather delay, deliveries, or write up today on site.

2026年9月30日
inbox-triage
未分类

Classify a construction office email, letter, or message pack and return severity, artefact type, one next action, and an unsent draft. Use when the user says triage, inbox, what do I do with this, email pack, letter from superintendent, or sort these…

2026年9月30日
itp-holdpoint-check
未分类

Build or check a construction ITP hold-witness-review pack against spec, drawings, and the planned activity including pre-pour and inspection records. Use when the user says ITP, hold point, witness point, inspection test plan, pre-pour, pre-cover, inspection…

2026年9月30日
meeting-minutes-actions
未分类

Turn a construction site, PCG, toolbox, kick-off, or client meeting into minutes plus an action register with owner and due date. Use when the user says minutes, toolbox talk, PCG, kick-off, site meeting, coordination meeting, or extract actions from a…

2026年9月30日
rfi-drafter
未分类

Draft a single-question construction RFI with drawing and spec references, options, and date information is needed. Use when the user says RFI, request for information, clarification, drawing clash, spec conflict, or needs a question sent to the…