| name | division-14-conveying-equipment-bid-scope |
| description | Whole-division starter rules for CSI Division 14 - Conveying Equipment. Use when starting, triaging, validating, or packaging a commercial elevator, lift, escalator, or conveying equipment bid. |
Division 14 - Conveying Equipment Bid Scope
Company: Your Company
CSI division(s): 14
Spec section hints: 14 00 00, 14 20 00, 14 21 00, 14 24 00, 14 30 00, 14 40 00, 14 90 00
Scope Rule
Base bid is limited to CSI Division 14 - Conveying Equipment work specifically assigned to the bidder: elevators, lifts, escalators, moving walks, hoists, and related conveying systems. Hoistway construction, structural supports, electrical feeders, fire alarm interfaces, pits, and permits must be explicitly included, excluded, or flagged before pricing.
Base Scope
- elevators when assigned
- wheelchair and platform lifts when assigned
- escalators and moving walks when assigned
- hoists and cranes when assigned
- conveyors when assigned
- controls furnished with conveying equipment
- startup and inspection support when assigned
Terms That Usually Identify This Scope
- conveying equipment
- elevator
- lift
- escalator
- moving walk
- hoist
- conveyor
- 14 00
Adjacent Scope To Exclude By Default
- structural steel
- concrete pit
- electrical feeder
- fire alarm wiring
Adjacent Scope To Flag Before Pricing
- hoistway
- pit
- machine room
- fire alarm
- inspection
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-14-conveying-equipment.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-14-conveying-equipment before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.