Skip to main content

division-14-conveying-equipment-bid-scope

Whole-division starter rules for CSI Division 14 - Conveying Equipment. Use when starting, triaging, validating, or packaging a commercial elevator, lift, escalator, or conveying equipment bid.

Aller à l'installation

Informations de source

Dépôt
ContractorKeith/contractor-bid
Dernière activité de la source
1 juillet 2026 à 22:41
Langue détectée de SKILL.md
anglais
Étoiles
5
Forks
1

Options d'installation

Le prompt qui vérifie d'abord la source est sélectionné par défaut. Vous pouvez passer à une commande directe ou télécharger une copie locale.

Vérifiez les fichiers source

Lisez SKILL.md et les fichiers associés affichés par SkillsMP avant de décider de l'installer.

Affichage de SKILL.md

SKILL.md
Instructions source · Aperçu en lecture seule
name
division-14-conveying-equipment-bid-scope
description
Whole-division starter rules for CSI Division 14 - Conveying Equipment. Use when starting, triaging, validating, or packaging a commercial elevator, lift, escalator, or conveying equipment bid.
# Division 14 - Conveying Equipment Bid Scope Company: Your Company CSI division(s): 14 Spec section hints: 14 00 00, 14 20 00, 14 21 00, 14 24 00, 14 30 00, 14 40 00, 14 90 00 ## Scope Rule Base bid is limited to CSI Division 14 - Conveying Equipment work specifically assigned to the bidder: elevators, lifts, escalators, moving walks, hoists, and related conveying systems. Hoistway construction, structural supports, electrical feeders, fire alarm interfaces, pits, and permits must be explicitly included, excluded, or flagged before pricing. ## Base Scope - elevators when assigned - wheelchair and platform lifts when assigned - escalators and moving walks when assigned - hoists and cranes when assigned - conveyors when assigned - controls furnished with conveying equipment - startup and inspection support when assigned ## Terms That Usually Identify This Scope - conveying equipment - elevator - lift - escalator - moving walk - hoist - conveyor - 14 00 ## Adjacent Scope To Exclude By Default - structural steel - concrete pit - electrical feeder - fire alarm wiring ## Adjacent Scope To Flag Before Pricing - hoistway - pit - machine room - fire alarm - inspection ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-14-conveying-equipment`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-14-conveying-equipment` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
Voir sur GitHub