division-14-conveying-equipment-bid-scope

Whole-division starter rules for CSI Division 14 - Conveying Equipment. Use when starting, triaging, validating, or packaging a commercial elevator, lift, escalator, or conveying equipment bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
division-14-conveying-equipment-bid-scope
description
Whole-division starter rules for CSI Division 14 - Conveying Equipment. Use when starting, triaging, validating, or packaging a commercial elevator, lift, escalator, or conveying equipment bid.
# Division 14 - Conveying Equipment Bid Scope Company: Your Company CSI division(s): 14 Spec section hints: 14 00 00, 14 20 00, 14 21 00, 14 24 00, 14 30 00, 14 40 00, 14 90 00 ## Scope Rule Base bid is limited to CSI Division 14 - Conveying Equipment work specifically assigned to the bidder: elevators, lifts, escalators, moving walks, hoists, and related conveying systems. Hoistway construction, structural supports, electrical feeders, fire alarm interfaces, pits, and permits must be explicitly included, excluded, or flagged before pricing. ## Base Scope - elevators when assigned - wheelchair and platform lifts when assigned - escalators and moving walks when assigned - hoists and cranes when assigned - conveyors when assigned - controls furnished with conveying equipment - startup and inspection support when assigned ## Terms That Usually Identify This Scope - conveying equipment - elevator - lift - escalator - moving walk - hoist - conveyor - 14 00 ## Adjacent Scope To Exclude By Default - structural steel - concrete pit - electrical feeder - fire alarm wiring ## Adjacent Scope To Flag Before Pricing - hoistway - pit - machine room - fire alarm - inspection ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-14-conveying-equipment`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-14-conveying-equipment` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.