Skip to main content

gao-schedule

Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.

الانتقال إلى التثبيت

معلومات المصدر

المستودع
jgsystemsconsulting/jgs-se-knowledge-packs
آخر نشاط في المصدر
١٤ أغسطس ٢٠٢٦ في ٢٠:٢٦
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
٣
التفرعات
٠

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.