gao-schedule

Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.

跳到安装

来源信息

仓库
jgsystemsconsulting/jgs-se-knowledge-packs
最近来源活动
2026年8月14日 20:26
检测到的 SKILL.md 语言
英语
星标
3
分支
0

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。