gao-schedule

Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.

Jump to install

Source facts

Repository
jgsystemsconsulting/jgs-se-knowledge-packs
Last source activity
August 14, 2026 at 20:26
Detected SKILL.md language
English
Stars
3
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.