Skip to main content

pbi-lifecycle

End-to-end Power BI delivery project lifecycle — folder bootstrap, PBIP file scaffold, Git tracking with private GitHub repo, theme refresh propagation, and environment promotion (Dev → Test → Prod). One skill that takes a Power BI delivery project from "empty disk" to "deployable, version-controlled, env-promotable" without requiring the operator to know git, the PBIP file format, or the MAX_PATH 256 quirks of Power BI Desktop. Phase 1 (folder bootstrap, additive-only) is generic and runs against any client. Phase 2 (PBIP scaffold from scratch in PBIR-Legacy with Auto Date/Time disabled by default and theme auto-applied) generates a working .pbip file that opens cleanly. Phase 3 (Git + GitHub CLI integration with always-private repos and project-scoped commits) gives version control without the operator typing a single git command. Phases 4 and 5 (theme refresh, env promotion) ship as design-locked roadmap until real-PBIP calibration completes. Use this skill whenever the operator asks anything resembling st

Jump to install

Source facts

Repository
gusbavia/pbi-lifecycle
Last source activity
June 11, 2026 at 11:02
Detected SKILL.md language
English
Stars
3
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.