Skip to main content

pbi-lifecycle

End-to-end Power BI delivery project lifecycle — folder bootstrap, PBIP file scaffold, Git tracking with private GitHub repo, theme refresh propagation, and environment promotion (Dev → Test → Prod). One skill that takes a Power BI delivery project from "empty disk" to "deployable, version-controlled, env-promotable" without requiring the operator to know git, the PBIP file format, or the MAX_PATH 256 quirks of Power BI Desktop. Phase 1 (folder bootstrap, additive-only) is generic and runs against any client. Phase 2 (PBIP scaffold from scratch in PBIR-Legacy with Auto Date/Time disabled by default and theme auto-applied) generates a working .pbip file that opens cleanly. Phase 3 (Git + GitHub CLI integration with always-private repos and project-scoped commits) gives version control without the operator typing a single git command. Phases 4 and 5 (theme refresh, env promotion) ship as design-locked roadmap until real-PBIP calibration completes. Use this skill whenever the operator asks anything resembling st

설치로 이동

소스 정보

저장소
gusbavia/pbi-lifecycle
최근 소스 활동
2026년 6월 11일 11:02
감지된 SKILL.md 언어
영어
스타
3
포크
0

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.