Skip to main content

pbi-lifecycle

End-to-end Power BI delivery project lifecycle — folder bootstrap, PBIP file scaffold, Git tracking with private GitHub repo, theme refresh propagation, and environment promotion (Dev → Test → Prod). One skill that takes a Power BI delivery project from "empty disk" to "deployable, version-controlled, env-promotable" without requiring the operator to know git, the PBIP file format, or the MAX_PATH 256 quirks of Power BI Desktop. Phase 1 (folder bootstrap, additive-only) is generic and runs against any client. Phase 2 (PBIP scaffold from scratch in PBIR-Legacy with Auto Date/Time disabled by default and theme auto-applied) generates a working .pbip file that opens cleanly. Phase 3 (Git + GitHub CLI integration with always-private repos and project-scoped commits) gives version control without the operator typing a single git command. Phases 4 and 5 (theme refresh, env promotion) ship as design-locked roadmap until real-PBIP calibration completes. Use this skill whenever the operator asks anything resembling st

Zur Installation springen

Quellinformationen

Repository
gusbavia/pbi-lifecycle
Letzte Quellaktivität
11. Juni 2026 um 11:02
Erkannte Sprache von SKILL.md
Englisch
Sterne
3
Forks
0

Installationsoptionen

Standardmäßig ist der Prompt ausgewählt, der zuerst die Quelle prüft. Sie können zu einem direkten Befehl wechseln oder eine lokale Kopie herunterladen.

Quelldateien prüfen

Lesen Sie SKILL.md und alle von SkillsMP angezeigten Begleitdateien, bevor Sie sich für eine Installation entscheiden.