division-03-concrete-bid-scope

Whole-division starter rules for CSI Division 03 - Concrete. Use when starting, triaging, validating, or packaging a commercial concrete bid.

跳到安装

来源信息

仓库
ContractorKeith/contractor-bid
最近来源活动
2026年7月1日 22:41
检测到的 SKILL.md 语言
英语
星标
5
分支
1

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。

正在显示 SKILL.md

SKILL.md
来源说明 · 只读预览
name
division-03-concrete-bid-scope
description
Whole-division starter rules for CSI Division 03 - Concrete. Use when starting, triaging, validating, or packaging a commercial concrete bid.
# Division 03 - Concrete Bid Scope Company: Your Company CSI division(s): 03 Spec section hints: 03 00 00, 03 10 00, 03 20 00, 03 30 00, 03 35 00, 03 40 00, 03 60 00 ## Scope Rule Base bid is limited to CSI Division 03 - Concrete work specifically assigned to the bidder: forming, reinforcing, cast-in-place, precast, finishes, and concrete repair. Earthwork, asphalt paving, utilities, landscaping, structural steel, waterproofing, and delegated design must be explicitly included, excluded, or flagged before pricing. ## Base Scope - concrete formwork - reinforcing steel and accessories - cast-in-place concrete - concrete slabs and pads - concrete finishing and curing - precast concrete when assigned - concrete repair and patching when assigned ## Terms That Usually Identify This Scope - concrete - cast-in-place - precast - rebar - reinforcing - formwork - slab - footing - curb - 03 00 ## Adjacent Scope To Exclude By Default - asphalt - striping - landscaping - irrigation - site utility ## Adjacent Scope To Flag Before Pricing - sawcut - demolition - excavation - vapor barrier - waterproofing ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-03-concrete`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-03-concrete` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.