Skip to main content

division-12-furnishings-bid-scope

Whole-division starter rules for CSI Division 12 - Furnishings. Use when starting, triaging, validating, or packaging a commercial furnishings bid.

跳到安装

来源信息

仓库
ContractorKeith/contractor-bid
最近来源活动
2026年7月1日 22:41
检测到的 SKILL.md 语言
英语
星标
5
分支
1

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。

正在显示 SKILL.md

SKILL.md
来源说明 · 只读预览
name
division-12-furnishings-bid-scope
description
Whole-division starter rules for CSI Division 12 - Furnishings. Use when starting, triaging, validating, or packaging a commercial furnishings bid.
# Division 12 - Furnishings Bid Scope Company: Your Company CSI division(s): 12 Spec section hints: 12 00 00, 12 21 00, 12 24 00, 12 32 00, 12 36 00, 12 48 00, 12 50 00 ## Scope Rule Base bid is limited to CSI Division 12 - Furnishings work specifically assigned to the bidder: window treatments, casework, countertops, entrance mats, furniture, seating, and systems furniture. Millwork in Division 06, appliances, electrical/data connections, blocking, and owner-furnished items must be explicitly included, excluded, or flagged before pricing. ## Base Scope - window treatments - manufactured casework when assigned - countertops when assigned - entrance floor mats and frames - furniture and seating when assigned - systems furniture when assigned - accessory furnishings when assigned ## Terms That Usually Identify This Scope - furnishings - window treatment - shade - casework - countertop - furniture - seating - entrance mat - 12 00 ## Adjacent Scope To Exclude By Default - rough carpentry - electrical wiring - plumbing fixtures - appliances ## Adjacent Scope To Flag Before Pricing - blocking - power/data - owner furnished - field measure ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-12-furnishings`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-12-furnishings` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
在 GitHub 查看