| name | division-21-fire-suppression-bid-scope |
| description | Whole-division starter rules for CSI Division 21 - Fire Suppression. Use when starting, triaging, validating, or packaging a commercial fire suppression bid. |
Division 21 - Fire Suppression Bid Scope
Company: Your Company
CSI division(s): 21
Spec section hints: 21 00 00, 21 05 00, 21 10 00, 21 13 00, 21 20 00, 21 30 00
Scope Rule
Base bid is limited to CSI Division 21 - Fire Suppression work specifically assigned to the bidder: sprinkler, standpipe, fire pump, clean agent, and special fire suppression systems. Underground utilities, fire alarm, electrical power, structural supports, patching, and delegated design must be explicitly included, excluded, or flagged before pricing.
Base Scope
- wet and dry sprinkler systems
- standpipe systems when assigned
- fire pump systems when assigned
- clean agent or special suppression when assigned
- sprinkler piping and heads
- valves, trim, and specialties
- hydraulic calculations when assigned
Terms That Usually Identify This Scope
- fire suppression
- sprinkler
- standpipe
- fire pump
- clean agent
- deluge
- preaction
- 21 00
Adjacent Scope To Exclude By Default
- fire alarm
- electrical feeder
- site water utility
- patching
Adjacent Scope To Flag Before Pricing
- hydraulic calculation
- fire pump
- underground
- fire alarm
- permit
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-21-fire-suppression.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-21-fire-suppression before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.