Skip to main content

division-21-fire-suppression-bid-scope

Whole-division starter rules for CSI Division 21 - Fire Suppression. Use when starting, triaging, validating, or packaging a commercial fire suppression bid.

跳到安装

来源信息

仓库
ContractorKeith/contractor-bid
最近来源活动
2026年7月1日 22:41
检测到的 SKILL.md 语言
英语
星标
5
分支
1

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。

正在显示 SKILL.md

SKILL.md
来源说明 · 只读预览
name
division-21-fire-suppression-bid-scope
description
Whole-division starter rules for CSI Division 21 - Fire Suppression. Use when starting, triaging, validating, or packaging a commercial fire suppression bid.
# Division 21 - Fire Suppression Bid Scope Company: Your Company CSI division(s): 21 Spec section hints: 21 00 00, 21 05 00, 21 10 00, 21 13 00, 21 20 00, 21 30 00 ## Scope Rule Base bid is limited to CSI Division 21 - Fire Suppression work specifically assigned to the bidder: sprinkler, standpipe, fire pump, clean agent, and special fire suppression systems. Underground utilities, fire alarm, electrical power, structural supports, patching, and delegated design must be explicitly included, excluded, or flagged before pricing. ## Base Scope - wet and dry sprinkler systems - standpipe systems when assigned - fire pump systems when assigned - clean agent or special suppression when assigned - sprinkler piping and heads - valves, trim, and specialties - hydraulic calculations when assigned ## Terms That Usually Identify This Scope - fire suppression - sprinkler - standpipe - fire pump - clean agent - deluge - preaction - 21 00 ## Adjacent Scope To Exclude By Default - fire alarm - electrical feeder - site water utility - patching ## Adjacent Scope To Flag Before Pricing - hydraulic calculation - fire pump - underground - fire alarm - permit ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-21-fire-suppression`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-21-fire-suppression` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
在 GitHub 查看