| name | division-27-communications-bid-scope |
| description | Whole-division starter rules for CSI Division 27 - Communications. Use when starting, triaging, validating, or packaging a commercial communications or structured cabling bid. |
Division 27 - Communications Bid Scope
Company: Your Company
CSI division(s): 27
Spec section hints: 27 00 00, 27 05 00, 27 10 00, 27 20 00, 27 30 00, 27 40 00, 27 50 00
Scope Rule
Base bid is limited to CSI Division 27 - Communications work specifically assigned to the bidder: pathways when assigned, structured cabling, racks, grounding, voice/data, AV, paging, intercom, and communications equipment. Electrical power, security, fire alarm, owner network equipment, service provider work, and programming must be explicitly included, excluded, or flagged before pricing.
Base Scope
- structured cabling
- communications pathways when assigned
- equipment racks and cable management
- telecommunications grounding when assigned
- voice/data outlets and patch panels
- audio-video systems when assigned
- paging and intercom when assigned
Terms That Usually Identify This Scope
- communications
- structured cabling
- data
- telecom
- fiber
- rack
- patch panel
- audio visual
- 27 00
Adjacent Scope To Exclude By Default
- electrical power
- security
- fire alarm
- utility service provider
Adjacent Scope To Flag Before Pricing
- owner equipment
- service provider
- pathway
- testing
- certification
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-27-communications.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-27-communications before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.