Skip to main content
تشغيل أي مهارة في Manus
بنقرة واحدة
مستودع GitHub

openfactory

يحتوي openfactory على 10 من skills المجمعة من mahidalhan، مع تغطية مهنية على مستوى المستودع وصفحات skill داخل الموقع.

skills مجمعة
10
Stars
0
محدث
2026-07-21
Forks
0
التغطية المهنية
1 فئات مهنية · 100% مصنفة
مستكشف المستودعات

Skills في هذا المستودع

bottleneck-capacity-mix
المهندسون الصناعيون

Use when output is below demand, WIP accumulates, work centers compete for investment, product mix changes the constraint, or management must compare overtime, debottlenecking, outsourcing, and capex options.

2026-07-21
daily-management-cadence
المهندسون الصناعيون

Use when a released factory plan needs repeated checkpoints, plan-versus-actual review, blocker ownership, exception escalation, or a concise daily control room across production, sales, material, labor, quality, and cash.

2026-07-21
demand-backward-production-planning
المهندسون الصناعيون

Use when orders, forecasts, ship dates, routings, lead times, WIP, and capacity must be converted into a feasible production plan or when an existing plan no longer matches shop-floor reality.

2026-07-21
factory-capital-efficiency
المهندسون الصناعيون

Use when a factory owner asks where capital is tied up, why ROIC is weak, which operating levers could raise profit or capital turns, or what 30-90 day improvement portfolio to prioritize.

2026-07-21
material-availability-gate
المهندسون الصناعيون

Use when a production plan, customer promise, purchase decision, or stage release depends on material quantity, grade, specification, quality clearance, supplier timing, or an approved substitute.

2026-07-21
quality-rework-loop
المهندسون الصناعيون

Use when defects, scrap, rework, customer claims, inspection holds, yield loss, or repeat quality failures are reducing margin, consuming capacity, or threatening shipment release.

2026-07-21
sales-production-commitment
المهندسون الصناعيون

Use when accepting, reprioritizing, repricing, deferring, or changing a customer order requires a joint view of demand, contribution margin, material, finite capacity, lead time, and delivery risk.

2026-07-21
standard-cost-margin-bridge
المهندسون الصناعيون

Use when a factory needs product, order, or customer cost and margin truth; a quote or price must be checked; actual cost differs from standard; or material, labor, overhead, freight, scrap, and claims must be reconciled.

2026-07-21
workforce-shift-coverage
المهندسون الصناعيون

Use when a production plan depends on skilled labor, certifications, attendance, shift patterns, overtime, cross-training, reassignment, or deciding whether labor is the binding capacity constraint.

2026-07-21
working-capital-cash-conversion
المهندسون الصناعيون

Use when cash is trapped in inventory, WIP, receivables, or supplier terms; liquidity does not match profit; or a factory owner needs a cash-conversion diagnosis and a controlled cash-release plan.

2026-07-21