Skip to main content
Jeden Skill in Manus ausführen
mit einem Klick
GitHub-Repository

openfactory

openfactory enthält 10 gesammelte Skills von mahidalhan, mit Repository-Berufsabdeckung und Skill-Detailseiten auf SkillsMP.

gesammelte Skills
10
Stars
0
aktualisiert
2026-07-21
Forks
0
Berufsabdeckung
1 Berufskategorien · 100% klassifiziert
Repository-Explorer

Skills in diesem Repository

bottleneck-capacity-mix
Industrieingenieure

Use when output is below demand, WIP accumulates, work centers compete for investment, product mix changes the constraint, or management must compare overtime, debottlenecking, outsourcing, and capex options.

2026-07-21
daily-management-cadence
Industrieingenieure

Use when a released factory plan needs repeated checkpoints, plan-versus-actual review, blocker ownership, exception escalation, or a concise daily control room across production, sales, material, labor, quality, and cash.

2026-07-21
demand-backward-production-planning
Industrieingenieure

Use when orders, forecasts, ship dates, routings, lead times, WIP, and capacity must be converted into a feasible production plan or when an existing plan no longer matches shop-floor reality.

2026-07-21
factory-capital-efficiency
Industrieingenieure

Use when a factory owner asks where capital is tied up, why ROIC is weak, which operating levers could raise profit or capital turns, or what 30-90 day improvement portfolio to prioritize.

2026-07-21
material-availability-gate
Industrieingenieure

Use when a production plan, customer promise, purchase decision, or stage release depends on material quantity, grade, specification, quality clearance, supplier timing, or an approved substitute.

2026-07-21
quality-rework-loop
Industrieingenieure

Use when defects, scrap, rework, customer claims, inspection holds, yield loss, or repeat quality failures are reducing margin, consuming capacity, or threatening shipment release.

2026-07-21
sales-production-commitment
Industrieingenieure

Use when accepting, reprioritizing, repricing, deferring, or changing a customer order requires a joint view of demand, contribution margin, material, finite capacity, lead time, and delivery risk.

2026-07-21
standard-cost-margin-bridge
Industrieingenieure

Use when a factory needs product, order, or customer cost and margin truth; a quote or price must be checked; actual cost differs from standard; or material, labor, overhead, freight, scrap, and claims must be reconciled.

2026-07-21
workforce-shift-coverage
Industrieingenieure

Use when a production plan depends on skilled labor, certifications, attendance, shift patterns, overtime, cross-training, reassignment, or deciding whether labor is the binding capacity constraint.

2026-07-21
working-capital-cash-conversion
Industrieingenieure

Use when cash is trapped in inventory, WIP, receivables, or supplier terms; liquidity does not match profit; or a factory owner needs a cash-conversion diagnosis and a controlled cash-release plan.

2026-07-21