Skip to main content
在 Manus 中运行任何 Skill
一键导入
GitHub 仓库

openfactory

openfactory 收录了来自 mahidalhan 的 10 个 skills,并提供仓库级职业覆盖和站内 skill 详情页。

已收集 skills
10
Stars
0
更新
2026-07-21
Forks
0
职业覆盖
1 个职业分类 · 已分类 100%
仓库浏览

这个仓库中的 skills

bottleneck-capacity-mix
工业工程师

Use when output is below demand, WIP accumulates, work centers compete for investment, product mix changes the constraint, or management must compare overtime, debottlenecking, outsourcing, and capex options.

2026-07-21
daily-management-cadence
工业工程师

Use when a released factory plan needs repeated checkpoints, plan-versus-actual review, blocker ownership, exception escalation, or a concise daily control room across production, sales, material, labor, quality, and cash.

2026-07-21
demand-backward-production-planning
工业工程师

Use when orders, forecasts, ship dates, routings, lead times, WIP, and capacity must be converted into a feasible production plan or when an existing plan no longer matches shop-floor reality.

2026-07-21
factory-capital-efficiency
工业工程师

Use when a factory owner asks where capital is tied up, why ROIC is weak, which operating levers could raise profit or capital turns, or what 30-90 day improvement portfolio to prioritize.

2026-07-21
material-availability-gate
工业工程师

Use when a production plan, customer promise, purchase decision, or stage release depends on material quantity, grade, specification, quality clearance, supplier timing, or an approved substitute.

2026-07-21
quality-rework-loop
工业工程师

Use when defects, scrap, rework, customer claims, inspection holds, yield loss, or repeat quality failures are reducing margin, consuming capacity, or threatening shipment release.

2026-07-21
sales-production-commitment
工业工程师

Use when accepting, reprioritizing, repricing, deferring, or changing a customer order requires a joint view of demand, contribution margin, material, finite capacity, lead time, and delivery risk.

2026-07-21
standard-cost-margin-bridge
工业工程师

Use when a factory needs product, order, or customer cost and margin truth; a quote or price must be checked; actual cost differs from standard; or material, labor, overhead, freight, scrap, and claims must be reconciled.

2026-07-21
workforce-shift-coverage
工业工程师

Use when a production plan depends on skilled labor, certifications, attendance, shift patterns, overtime, cross-training, reassignment, or deciding whether labor is the binding capacity constraint.

2026-07-21
working-capital-cash-conversion
工业工程师

Use when cash is trapped in inventory, WIP, receivables, or supplier terms; liquidity does not match profit; or a factory owner needs a cash-conversion diagnosis and a controlled cash-release plan.

2026-07-21