Skip to main content
Run any Skill in Manus
with one click
GitHub repository

openfactory

openfactory contains 10 collected skills from mahidalhan, with repository-level occupation coverage and site-owned skill detail pages.

skills collected
10
Stars
0
updated
2026-07-21
Forks
0
Occupation coverage
1 occupation categories · 100% classified
repository explorer

Skills in this repository

bottleneck-capacity-mix
industrial-engineers

Use when output is below demand, WIP accumulates, work centers compete for investment, product mix changes the constraint, or management must compare overtime, debottlenecking, outsourcing, and capex options.

2026-07-21
daily-management-cadence
industrial-engineers

Use when a released factory plan needs repeated checkpoints, plan-versus-actual review, blocker ownership, exception escalation, or a concise daily control room across production, sales, material, labor, quality, and cash.

2026-07-21
demand-backward-production-planning
industrial-engineers

Use when orders, forecasts, ship dates, routings, lead times, WIP, and capacity must be converted into a feasible production plan or when an existing plan no longer matches shop-floor reality.

2026-07-21
factory-capital-efficiency
industrial-engineers

Use when a factory owner asks where capital is tied up, why ROIC is weak, which operating levers could raise profit or capital turns, or what 30-90 day improvement portfolio to prioritize.

2026-07-21
material-availability-gate
industrial-engineers

Use when a production plan, customer promise, purchase decision, or stage release depends on material quantity, grade, specification, quality clearance, supplier timing, or an approved substitute.

2026-07-21
quality-rework-loop
industrial-engineers

Use when defects, scrap, rework, customer claims, inspection holds, yield loss, or repeat quality failures are reducing margin, consuming capacity, or threatening shipment release.

2026-07-21
sales-production-commitment
industrial-engineers

Use when accepting, reprioritizing, repricing, deferring, or changing a customer order requires a joint view of demand, contribution margin, material, finite capacity, lead time, and delivery risk.

2026-07-21
standard-cost-margin-bridge
industrial-engineers

Use when a factory needs product, order, or customer cost and margin truth; a quote or price must be checked; actual cost differs from standard; or material, labor, overhead, freight, scrap, and claims must be reconciled.

2026-07-21
workforce-shift-coverage
industrial-engineers

Use when a production plan depends on skilled labor, certifications, attendance, shift patterns, overtime, cross-training, reassignment, or deciding whether labor is the binding capacity constraint.

2026-07-21
working-capital-cash-conversion
industrial-engineers

Use when cash is trapped in inventory, WIP, receivables, or supplier terms; liquidity does not match profit; or a factory owner needs a cash-conversion diagnosis and a controlled cash-release plan.

2026-07-21