Skip to main content

drywall-framing-bid-scope

Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
drywall-framing-bid-scope
description
Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid.
# Drywall and Metal Framing Bid Scope Company: Your Company CSI division(s): 09 Spec section hints: 09 21 16, 09 29 00 ## Scope Rule Base bid is limited to metal framing, gypsum board assemblies, finishing, and listed accessories. Adjacent insulation, ceilings, blocking, painting, and firestopping must be explicitly included, excluded, or flagged before pricing. ## Base Scope - metal studs - gypsum board - shaftwall - drywall finishing - corner bead - control joints ## Terms That Usually Identify This Scope - gypsum - drywall - metal stud - shaftwall - partition - 09 21 ## Adjacent Scope To Exclude By Default - millwork - casework - doors - hardware - flooring ## Adjacent Scope To Flag Before Pricing - insulation - acoustical ceiling - firestopping - blocking - painting ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile drywall-framing`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile drywall-framing` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub