Skip to main content

drywall-framing-bid-scope

Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid.

Datos de origen

Repositorio
ContractorKeith/contractor-bid
Última actividad en el origen
1 de julio de 2026 a las 22:41
Idioma detectado de SKILL.md
inglés
Estrellas
5
Forks
1

Opciones de instalación

De forma predeterminada está seleccionado el prompt que primero revisa el origen. Puedes cambiar a un comando directo o descargar una copia local.

Revisa los archivos de origen

Lee SKILL.md y los archivos complementarios que muestra SkillsMP antes de decidir si quieres instalarlo.

Mostrando SKILL.md

SKILL.md
Instrucciones de origen · Vista previa de solo lectura
name
drywall-framing-bid-scope
description
Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid.
# Drywall and Metal Framing Bid Scope Company: Your Company CSI division(s): 09 Spec section hints: 09 21 16, 09 29 00 ## Scope Rule Base bid is limited to metal framing, gypsum board assemblies, finishing, and listed accessories. Adjacent insulation, ceilings, blocking, painting, and firestopping must be explicitly included, excluded, or flagged before pricing. ## Base Scope - metal studs - gypsum board - shaftwall - drywall finishing - corner bead - control joints ## Terms That Usually Identify This Scope - gypsum - drywall - metal stud - shaftwall - partition - 09 21 ## Adjacent Scope To Exclude By Default - millwork - casework - doors - hardware - flooring ## Adjacent Scope To Flag Before Pricing - insulation - acoustical ceiling - firestopping - blocking - painting ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile drywall-framing`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile drywall-framing` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
Ver en GitHub