| name | drywall-framing-bid-scope |
| description | Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid. |
Drywall and Metal Framing Bid Scope
Company: Your Company
CSI division(s): 09
Spec section hints: 09 21 16, 09 29 00
Scope Rule
Base bid is limited to metal framing, gypsum board assemblies, finishing, and listed accessories. Adjacent insulation, ceilings, blocking, painting, and firestopping must be explicitly included, excluded, or flagged before pricing.
Base Scope
- metal studs
- gypsum board
- shaftwall
- drywall finishing
- corner bead
- control joints
Terms That Usually Identify This Scope
- gypsum
- drywall
- metal stud
- shaftwall
- partition
- 09 21
Adjacent Scope To Exclude By Default
- millwork
- casework
- doors
- hardware
- flooring
Adjacent Scope To Flag Before Pricing
- insulation
- acoustical ceiling
- firestopping
- blocking
- painting
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile drywall-framing.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile drywall-framing before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.