一键导入
drywall-framing-bid-scope
Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Bid-project scope rules for concrete flatwork. Use when starting, triaging, validating, or packaging a commercial concrete flatwork bid.
Whole-division starter rules for CSI Division 03 - Concrete. Use when starting, triaging, validating, or packaging a commercial concrete bid.
Whole-division starter rules for CSI Division 04 - Masonry. Use when starting, triaging, validating, or packaging a commercial masonry bid.
Whole-division starter rules for CSI Division 05 - Metals. Use when starting, triaging, validating, or packaging a commercial metals bid.
Whole-division starter rules for CSI Division 06 - Wood, Plastics, and Composites. Use when starting, triaging, validating, or packaging a commercial carpentry or millwork bid.
Whole-division starter rules for CSI Division 07 - Thermal and Moisture Protection. Use when starting, triaging, validating, or packaging a commercial roofing, waterproofing, insulation, firestopping, or sealants bid.
| name | drywall-framing-bid-scope |
| description | Bid-project scope rules for drywall and metal framing. Use when starting, triaging, validating, or packaging a commercial interiors bid. |
Company: Your Company CSI division(s): 09 Spec section hints: 09 21 16, 09 29 00
Base bid is limited to metal framing, gypsum board assemblies, finishing, and listed accessories. Adjacent insulation, ceilings, blocking, painting, and firestopping must be explicitly included, excluded, or flagged before pricing.
bid-docs/.contractor-bid triage <project> --profile drywall-framing.bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.contractor-bid build-workbook <project>.contractor-bid check <project> --profile drywall-framing before sending anything out.contractor-bid learn and update this skill/profile when the correction should become a durable rule.Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.