Skip to main content

workforce-planning

Use when building or reviewing a headcount plan — covers connecting plan to strategy, ramp time, build/buy/borrow, and capacity reconciliation.

Zur Installation springen

Quellinformationen

Repository
ccashwell/agentic-hr
Letzte Quellaktivität
25. April 2026 um 23:49
Erkannte Sprache von SKILL.md
Englisch
Sterne
0
Forks
0

Installationsoptionen

Standardmäßig ist der Prompt ausgewählt, der zuerst die Quelle prüft. Sie können zu einem direkten Befehl wechseln oder eine lokale Kopie herunterladen.

Quelldateien prüfen

Lesen Sie SKILL.md und alle von SkillsMP angezeigten Begleitdateien, bevor Sie sich für eine Installation entscheiden.

SKILL.md wird angezeigt

SKILL.md
Quellanweisungen · Schreibgeschützte Vorschau
name
workforce-planning
description
Use when building or reviewing a headcount plan — covers connecting plan to strategy, ramp time, build/buy/borrow, and capacity reconciliation.
# Workforce Planning ## Core Principle: Outcomes Before Headcount Headcount is the output of the plan. The plan starts with required outcomes, derives roles, models capacity, and then sums to headcount. A plan that starts with "we need 80 people next year" and works backward is upside-down. ## Plan Construction 1. **Translate strategy to outcomes**: revenue plan, product roadmap, OKRs 2. **Translate outcomes to roles**: which roles produce these outcomes? 3. **Estimate productive capacity per role**: with ramp time 4. **Subtract current capacity**: account for existing employees and known attrition 5. **Derive net hires**: with start dates and ramp curves 6. **Reconcile to financial plan**: dollar cost, fully loaded 7. **Stage the hires**: align with revenue, fundraise, product milestones ## Build / Buy / Borrow For each capability gap: - **Build**: train an existing employee. Cheapest if the person exists; slowest if they don't - **Buy**: hire externally. Faster but more expensive and risky - **Borrow**: contractor, fractional, agency, advisor. Right when work is bounded or role uncertain Most plans default to "buy." Audit and push toward "build" or "borrow" where appropriate. ## Ramp Time Modeling A new hire produces fractional output during ramp: | Role type | Ramp curve | |-----------|------------| | IC, well-defined | 20% in month 1; 50% by month 3; 80% by month 6; 100% by month 9 | | IC, ambiguous | 10% month 1; 30% month 3; 60% month 6; 100% month 12 | | Manager | Slower: 50% by month 3; full by month 9–12 | | Senior leader | 12–18 months to full productivity | Model this explicitly in plans. Validate against historicals (track actual ramp curves to refine). ## Capacity vs. Roadmap Audit Quarterly: - List committed initiatives - Estimate capacity required (in person-months or similar) - Compare to actual capacity (with ramp factored in) - If capacity is < 80% of demand: cut roadmap, hire faster, or borrow ## Critical Role Bench Planning For top 20–50 roles: - Identify critical roles (loss = significant disruption) - Name backups (not always 1:1; sometimes a combination) - Identify development gap to readiness - Track retention signal Don't import enterprise 9-box succession at 50 people. Do build informal bench review at 200+. ## Contractor vs. Employee Classification matters legally (DOL, state AGs). Common factors: - Behavioral control (does the company direct how the work is done?) - Financial control (who provides tools, sets pricing, bears risk?) - Type of relationship (written contract, benefits, expectation of permanence?) When in doubt, classify as employee — misclassification is expensive. EOR (Employer of Record) services support international hiring without setting up local entities. EOR adds overhead but reduces complexity. ## Planning Cadences - **Annual**: full plan; tied to fundraise / revenue plan - **Quarterly**: re-forecast; reconcile actual vs. plan - **Monthly**: ATS funnel review; pacing check - **Ad-hoc**: pivot points (new product line, M&A, market changes) ## Common Failures - Hockey-stick hiring plans disconnected from revenue - "We need a Head of X" reflex without articulating the work - Backfilling vs. rebuilding (auto-backfill when role should be eliminated) - Contractor sprawl (classification risk) - Cost-of-living illusion (assuming all geos are equally productive at the same comp) - Founder span explosion (no plan to add layer) - No succession for the founder ## Output Format Headcount plan spreadsheet: - Tab 1: Plan by quarter (function, role, level, geo, start date, ramp, fully-loaded cost) - Tab 2: Roadmap → capacity mapping - Tab 3: Critical role bench - Tab 4: Ramp assumptions and historicals - Tab 5: Reconciliation to financial plan ## Cross-References - `workforce-planner` agent - `people-strategy-roadmap` skill - `org-design-principles` skill - `talent-acquisition-strategist` agent ## Key References - Hoffman, R., & Casnocha, B. (2014). *The Alliance*. - Boudreau, J., & Ramstad, P. (2007). *Beyond HR*. - Industry practitioner work on workforce planning at growth-stage tech
Auf GitHub ansehen