Skip to main content
Jeden Skill in Manus ausführen
mit einem Klick
GitHub-Repository

pm-skills

pm-skills enthält 71 gesammelte Skills von product-on-purpose, mit Repository-Berufsabdeckung und Skill-Detailseiten auf SkillsMP.

gesammelte Skills
71
Stars
456
aktualisiert
2026-07-06
Forks
59
Berufsabdeckung
5 Berufskategorien · 100% klassifiziert
Repository-Explorer

Skills in diesem Repository

define-prioritization-framework
Projektmanagementspezialisten

Run applicable prioritization frameworks (RICE, ICE, MoSCoW, Weighted Scoring, Kano) against a list of features or initiatives. Produces a comparison table showing where rankings agree and diverge across frameworks, and an executive summary with recommendation. Framework applicability is filtered by data availability; Kano requires customer research. Refuses to fabricate scores; produces an estimation scaffold when input data is missing.

2026-07-06
discover-interview-synthesis
Marktforschungsanalysten und Marketingspezialisten

Synthesizes user research interviews into actionable insights, patterns, and recommendations. Use after conducting user interviews, customer calls, or usability sessions to extract and communicate findings across participants. Distinct from foundation-meeting-recap, which summarizes one internal meeting for its attendees; this skill aggregates research conversations into evidence-backed findings.

2026-07-06
discover-journey-map
Marktforschungsanalysten und Marketingspezialisten

Maps a customer journey across stages, touchpoints, emotional curve, pain points, and moments of truth into a markdown artifact with an optional mermaid timeline or flowchart. Use when synthesizing existing research into the shape of a customer's experience, end-to-end or for one phase. Without research signal yet, run discover-interview-synthesis or measure-survey-analysis first; refuses to fabricate emotional or behavioral data.

2026-07-06
discover-market-sizing
Marktforschungsanalysten und Marketingspezialisten

Estimate market opportunity (TAM, SAM, SOM) using multiple sizing frameworks (top-down, bottom-up, comparable company, analogous market). Triangulates across frameworks, highlights where they converge and diverge as signal, and produces a calibrated range with source-graded confidence labels. Refuses unbounded fabrications; always offers a labeled lower-confidence path when data is thin. Used for investment cases, go/no-go decisions, and stakeholder pitches.

2026-07-06
foundation-lean-canvas
Projektmanagementspezialisten

Produces a one-page lean canvas across nine interlocking blocks (problem, customer, UVP, solution, channels, revenue, cost, metrics, unfair advantage) with optional inline HTML and SVG visual rendering. Use when framing a new product thesis, stress-testing an existing strategy, comparing strategic options side-by-side, or aligning a team on business-model assumptions. Works as a strategic hub that cross-links to deeper PM skills without duplicating them.

2026-07-06
foundation-meeting-agenda
Projektmanagementspezialisten

Produces an attendee-facing agenda that sets what will be discussed, who owns each topic, and how time will be spent. Supports ten meeting type variants (standup, planning, review, decision-making, brainstorm, 1-on-1, stakeholder-review, project-kickoff, working-session, exec-briefing). Emits a shareable summary suitable for Slack or email plus a full agenda with time-boxed topics, type tags, owners, attendee prep, and logistics.

2026-07-06
foundation-meeting-brief
Projektmanagementspezialisten

Produces a private strategic preparation document for the user before a meeting that matters. Captures stakes, stakeholder positions and reads, ranked desired outcomes, key messages, anticipated questions with prepared responses, risks and tensions, specific asks, and success signals. Distinct from meeting-agenda because this artifact is not shared with attendees; it is the user's personal tactical prep for meetings where positioning matters.

2026-07-06
foundation-meeting-recap
Projektmanagementspezialisten

Produces a topic-segmented post-meeting summary for attendees with decisions highlighted and actions captured inline per topic (plus a consolidated action view at the end). Auto-populates topic skeleton from a sibling meeting-agenda when available and reconciles planned vs. actual topics. Accepts transcripts from Zoom, Meet, Otter, Fireflies, Krisp MCP, or manual notes; runs on variable-quality input without blocking. For synthesizing user research interviews across participants, use discover-interview-synthesis.

2026-07-06
foundation-meeting-synthesize
Projektmanagementspezialisten

Cross-meeting archaeology skill. Consumes multiple meeting recaps (or raw notes) over a period and surfaces patterns invisible in any single meeting. Shows how decisions evolved, who has been saying what, where threads are stalling, and where contradictions have emerged. Produces a plain-text timeline, themes with confidence markers, stakeholder position tracking, consolidated decision list, contradiction flags, open items, narrative summary, and prioritized follow-ups.

2026-07-06
foundation-prioritized-action-plan
Projektmanagementspezialisten

Produce a comprehensive, evidence-grounded prioritized action plan from any PM input (notes, transcripts, drafts, executive asks, Slack threads, or a raw situation). Outputs one saveable document with an executive summary, input mirror, situation classification (Cynefin), the binding constraint (Theory of Constraints), prioritized questions and open decisions, a ranked action plan with the critical effort plus follow-ons, risks and pre-mortem, copy/paste prompts for downstream pm-skills, and an evidence map. Builds a source ledger and cites exact input quotes; refuses High-confidence plans for Complex or Chaotic situations. Use when you want the critical next effort and how to execute it.

2026-07-06
foundation-stakeholder-update
Projektmanagementspezialisten

Produces async communication to stakeholders, primarily non-attendees and secondarily some attendees who want a reference. Translates meeting outcomes into what-it-means language for readers, with channel variants (slack, teams, email, notion, exec-memo) and audience variants (engineering, design, leadership, customer-facing, mixed). Surfaces a primary CTA up front, flags technical-to-business translations for user verification, and detects thread continuation from prior updates.

2026-07-06
measure-survey-analysis
Marktforschungsanalysten und Marketingspezialisten

Analyze survey results into actionable PM insights. Produces persona segmentation, hypothesis validation status, thematic clustering of open-text responses, statistical confidence labels, prioritized recommendations, and what-NOT-to-conclude warnings. Refuses to overstate statistical significance from weak samples or biased instruments.

2026-07-06
utility-mermaid-diagrams
Projektmanagementspezialisten

Teaches PMs to create syntactically valid mermaid diagrams by selecting the right diagram type for their communication need, following syntax validity rules, and validating before shipping. Covers all 15 mermaid diagram types with PM-relevant examples and a dual-lens navigation system.

2026-07-06
utility-pm-changelog-curator
Softwareentwickler

Draft CHANGELOG entries from git log via the pm-changelog-curator sub-agent, applying the repo hygiene rules (describe what changed, public paths only, no attribution trailers). Returns a layered draft with a status summary for maintainer review; refuses a dirty working tree unless --committed-only is passed. Use when banking unreleased changes or preparing a release.

2026-07-06
define-opportunity-tree
Projektmanagementspezialisten

Creates an opportunity solution tree connecting a desired outcome to customer opportunities and candidate solutions, preventing solution-first jumps in continuous discovery. Use when structuring scattered feature ideas or communicating how the roadmap traces to outcomes. For ranking an existing flat list of candidates, use define-prioritization-framework instead; this skill discovers the list, it does not score one.

2026-07-05
deliver-launch-checklist
Projektmanagementspezialisten

Creates a cross-functional pre-launch checklist covering engineering, design, marketing, support, legal, and operations readiness, with owners, dates, and go/no-go criteria so nothing is missed before release. Use for significant or cross-team launches, not a small single-team change. For the customer-facing announcement of what shipped, use deliver-release-notes instead.

2026-07-05
develop-spike-summary
Softwareentwickler

Documents the results of a completed technical or design spike, capturing the original question, approach, evidence-backed findings, and a clear proceed-or-not recommendation so the team does not re-litigate the exploration. Use once a time-boxed investigation has concluded. For the architecture decision the spike informs, use develop-adr instead; for research-based exploration, use discover-interview-synthesis.

2026-07-05
discover-competitive-analysis
Marktforschungsanalysten und Marketingspezialisten

Creates a structured competitive analysis comparing features, pricing, and positioning across 3-5 direct and indirect competitors, with a 2x2 map and actionable strategic recommendations. Use before entering a market, planning differentiation, or after losing deals. For market size rather than competitor positioning, use discover-market-sizing instead.

2026-07-05
discover-stakeholder-summary
Projektmanagementspezialisten

Maps the people and groups with a stake in a project, documenting their needs, concerns, influence, and engagement approach. Use at project kickoff, when taking over from another PM, or when resistance signals misalignment. For the update you send to those stakeholders, use foundation-stakeholder-update instead; this skill maps them, that one talks to them.

2026-07-05
foundation-build-risk-review
Projektmanagementspezialisten

Runs a fast pre-build risk review on a product idea, feature request, or scope change, naming the single assumption most likely to make it fail and returning a clear verdict (build small, validate first, pivot first, or don't build yet) with a no-code validation step. Use before committing build effort, when triaging whether to honor a feature request, or when deciding whether to expand scope, ahead of writing a PRD. For a launched product's pivot-or-persevere decision, use iterate-pivot-decision instead.

2026-07-05
foundation-stakeholder-briefings
Projektmanagementspezialisten

Turns any source artifact (spec, discovery, research, GTM plan, experiment results, retro, or raw notes) into one canonical master document plus a set of audience-tailored briefings, each re-pitched to a stakeholder lens (executive, board, engineering, UX, PMM, sales, CS, legal, data, or a custom audience). Every briefing is a traceable projection of the master, so the versions never disagree. Use when one piece of work must reach several audiences who each need a different framing, decision, and level of detail.

2026-07-05
measure-dashboard-requirements
Projektmanagementspezialisten

Specifies what questions a dashboard must answer and the metrics, visualizations, filters, and data sources it needs, so data teams build something that informs decisions rather than displaying numbers. Use when requesting a dashboard or formalizing ad-hoc reporting. For the event tracking that feeds the dashboard, use measure-instrumentation-spec instead; instrument first, visualize second.

2026-07-05
measure-instrumentation-spec
Projektmanagementspezialisten

Specifies what analytics events to track, when they fire, and what properties to include, as a contract between product and engineering that prevents undertracked features. Use before engineering builds a feature or when auditing existing tracking for gaps. For the dashboard built on top of these events, use measure-dashboard-requirements instead.

2026-07-05
measure-okr-grader
Projektmanagementspezialisten

Scores completed OKR sets at cycle close with KR-level scoring per the canonical OKR type enum (committed | aspirational | learning | operational_health | compliance_or_safety), committed-vs-aspirational interpretation, evidence quality assessment, learning synthesis, and next-cycle recommendations. Refuses to retroactively change targets or shrink committed scope, average away guardrail KRs, treat 0.7 as success for committed or compliance_or_safety KRs, equate effort with impact, or use scores for individual performance. Hands off to iterate-lessons-log, iterate-retrospective, define-hypothesis, measure-dashboard-requirements, measure-instrumentation-spec, and foundation-okr-writer.

2026-07-05
tool-design-sprint-brief
Projektmanagementspezialisten

Pre-sprint brief that locks challenge, sprint questions, team and role assignments, customer recruiting plan, prototype medium, interview format, logistics, and success criteria before Monday of a Design Sprint. Use after the readiness verdict is Go and before Monday begins. Produces a two-page artifact the team and Decider sign off on as the contract for the next five days.

2026-07-05
tool-design-sprint-decide-and-storyboard
Projektmanagementspezialisten

Day 3 (Wednesday) move of a Design Sprint that runs the art museum layout, heat map, speed critique, straw poll, Decider supervote, rumble-vs-all-in-one decision, and the storyboard that drives Thursday's prototype build. The most decision-heavy day of the sprint. Use Wednesday morning and afternoon after Tuesday's sketches are collected and attribution-stripped. Produces the canonical 5-15 step storyboard that becomes the build spec.

2026-07-05
tool-design-sprint-map-and-target
Projektmanagementspezialisten

Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.

2026-07-05
tool-design-sprint-prototype-plan
Projektmanagementspezialisten

Day 4 (Thursday) move of a Design Sprint that produces the planning artifact for the day. Output covers the prototype role plan (Maker, Stitcher, Writer, Asset Collector, Interviewer), prototype brief (what to build, fidelity bar, time allocation per role), canonical Five-Act Interview script (Welcome, Context, Intro, Tasks, Debrief), trial-run checklist, and Friday participant confirmation tracker. The actual prototype build is craft work outside the skill's AI invocation surface. Use Thursday morning after Wednesday's storyboard is signed off.

2026-07-05
tool-design-sprint-readiness
Projektmanagementspezialisten

Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities. Use when a team is considering starting a Design Sprint and wants a fast yes/no diagnosis before committing five days of team time and customer recruiting cost.

2026-07-05
tool-design-sprint-sketch
Projektmanagementspezialisten

Day 2 (Tuesday) move of a Design Sprint that structures lightning demos and the four-step independent solution sketch protocol (Notes, Ideas, Crazy 8s, Solution Sketch). Each team member produces one solution sketch individually; the skill orchestrates the day but does not author the sketches themselves. Use Tuesday morning after Monday's target moment is locked. Output is the lightning demo board, sketch assignments, and the cohort of independent sketches that become Wednesday's heat-map material.

2026-07-05
tool-design-sprint-test-and-score
Projektmanagementspezialisten

Day 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers), observed patterns, hot takes from each team member, and the Decider summary (build, iterate, pivot, or stop, plus highest-confidence learning, most important revision, and next artifact). Use Friday after Thursday's prototype passes trial run and during/after the 5 customer interviews. The sprint's payoff artifact.

2026-07-05
tool-foundation-sprint-approach-options
Projektmanagementspezialisten

Day 2 morning move of a Foundation Sprint. Forces generation of 3 to 7 candidate approaches as one-page summaries before the team converges on a top bet. Use after Day 1 is signed and before Magic Lenses on Day 2 afternoon. Enforces a minimum of 3 approaches to prevent first-idea anchoring. Each approach summary names what it is, why it serves the differentiators, and includes a simple visual.

2026-07-05
tool-foundation-sprint-basics
Projektmanagementspezialisten

Day 1 morning move of a Foundation Sprint. Forces explicit team choices on target customer, important problem, team advantage, and competitors and alternatives. Produces a single coherent strategic frame that becomes the input to Day 1 afternoon Differentiation. Use after the sprint brief is signed and Day 1 morning is scheduled. Bundled artifact, not four separate decisions.

2026-07-05
tool-foundation-sprint-brief
Projektmanagementspezialisten

Pre-sprint brief that locks scope, the decision the sprint must unlock, team and role assignments, logistics, inputs to bring, and success criteria before Day 1 of a Foundation Sprint. Use after the readiness verdict is Go and before the sprint begins. Produces a one-page artifact the team and Decider sign off on as the contract for the next two days.

2026-07-05
tool-foundation-sprint-differentiation
Projektmanagementspezialisten

Day 1 afternoon move of a Foundation Sprint. Converts the morning's Basics frame into a defensible strategic position by scoring differentiator candidates against customer-perceived value, choosing two committed differentiators, plotting alternatives on a 2x2 chart, writing decision principles, and producing a one-page Mini Manifesto. Use after Basics is signed; before Approach Options the next morning.

2026-07-05
tool-foundation-sprint-founding-hypothesis
Projektmanagementspezialisten

Day 2 end capstone move of a Foundation Sprint. Compresses the sprint's full strategic frame into a single canonical sentence (the Founding Hypothesis) plus an assumption scorecard, why-we-believe, what-could-prove-us-wrong, and recommended next validation step. Use after Magic Lenses is signed. Strict canonical template; paraphrase is not accepted in v0.1.0. The Founding Hypothesis is the spine artifact the sprint exists to produce.

2026-07-05
tool-foundation-sprint-magic-lenses
Projektmanagementspezialisten

Day 2 afternoon move of a Foundation Sprint. Evaluates the candidate approach set through multiple lenses (4 classic plus at least 1 custom) to surface trade-offs, identify consistent winners and contradictions, and produce a top bet plus a backup plan. Use after Approach Options is signed. Lens scoring is a sense-making tool, not mathematical truth; arbitrary precision is a smell.

2026-07-05
tool-foundation-sprint-readiness
Projektmanagementspezialisten

Pre-sprint diagnostic that determines whether a team should run a Foundation Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, and pre-sprint activities. Use when a team is considering starting a Foundation Sprint and wants a fast yes/no diagnosis before committing two days of facilitated work.

2026-07-05
tool-note-and-vote
Projektmanagementspezialisten

Structured group-decision mechanic that captures silent ideation, voting summaries, and Decider sign-off in a single bundled artifact. Use when a small team needs to make a fast decision with diverse input, when groupthink is a risk, or when a workshop moment demands silent contribution before discussion. Applicable to Foundation Sprint, Design Sprint, and any participatory decision context.

2026-07-05
utility-pm-skill-builder
Projektmanagementspezialisten

Guides contributors from a PM skill idea to a complete Skill Implementation Packet aligned with pm-skills conventions. Runs gap analysis, validates through a Why Gate, classifies by type and phase, generates draft files, and writes to a staging area for review before promotion.

2026-07-05
Zeigt die Top 40 von 71 gesammelten Skills in diesem Repository.